Posts by K Hulett
Ranken Technical College, Ashland, MO. (2022)
Ranken Technical College is expanding into Mid-Missouri. Hulett Heating & Air will be installing all HVAC duct work and equipment for this exciting addition to Ashland and surrounding area. www.ashland.com/Ranken www.ranken.edu
Read MoreAmazon Distribution Center, Ashland, MO. (2022)
Amazon expands to Mid-Missouri! Hulett Heating & Air was selected to build and install all the duct work for Amazon’s distribution center, located in Ashland, Missouri. https://abc17news.com/news/2022/06/30/amazon-expects-to-bring-more-than-100-new-jobs-as-facility-opens-in-ashland/
Read MoreParker Fine Arts Building, Waynesville Schools, Waynesville, MO. (2021)
Hulett Heating & Air was chosen to furnish and install the HVAC systems and controls for the Waynesville R-VI school Parker Fine Arts Building renovation & expansion. https://www.waynesville.k12.mo.us/ https://tinyurl.com/48c98pab
Read MoreUtility Technology Center, State Tech, Linn, MO. Phase 2 (2021)
State Tech in Linn, Missouri, in expanding with a new Utility Technology Center. Hulett Heating & Air was selected to install the complete HVAC system and controls. KOMU News Story: https://tinyurl.com/5fbsavrz
Read MoreYork Elementary, Springfield, Missouri (2021)
The York Elementary Eagles of Springfield, Missouri will soon have a new home. Hulett Heating & Air was selected to fabricate and install the HVAC system for this new construction project. Along with a new elementary building, a FEMA shelter will also be built.
Read MoreJefferson City Public Schools (Completed 2021)
This project is a quick paced summer time upgrade of Thomas Jefferson & Lewis and Clark middle schools, including replacement of approximately 240 heat pumps and eight Dedicated Outdoor Air Systems (DOAS). Hulett Heating & Air will be installing the duct work.
Read MoreCostco, Springfield, Missouri (Completed 2021)
The new Costco in Springfield, Missouri is over 161,000 sq ft in size. Hulett HVAC and Sheet Metal Contractors has been selected to install all HVAC equipment and duct work.
Read MoreNorth Point High School, Wentzville, Missouri (Completed 2021)
For the home of the Wentzville Grizzlies, Hulett HVAC and Sheet Metal Contractor was selected to fabricate and install the HVAC system.
Read MoreAmazon Distribution Center, Republic, Missouri (Completed 2021)
Hulett HVAC and Sheet Metal Contractor has been selected to install the HVAC system for the 1.3 million square foot Amazon distribution center. The completed building will be almost 30 acres of enclosed office and warehouse space.
Read MoreSouth Shelby Elementary School, Shelbina, MO. (Completed 2020)
This project consists of new construction of an 36,808 square foot elementary school, opening August of 2020. Hulett Heating and Air Conditioning Company custom built and installed HVAC duct work, stainless steel hood venting, and Ductsox systems. https://www.cardinals.k12.mo.us/
Read More