Utility Technology Center, State Tech, Linn, MO. Phase 2 (2021)
State Tech in Linn, Missouri, in expanding with a new Utility Technology Center. Hulett Heating & Air was selected to install the complete HVAC system and controls.
KOMU News Story: https://tinyurl.com/5fbsavrz